|
|
Download entire Invitation to Bid:
W.O. 06-22 Water Treatment Plant L-Structure Improvements
|
|
|
| 9/9/2008 12:00 AM
|
|
|
| Published in The Billings Times 9/11, 9/18, & 9/25/08
|
|
|
| 9/30/2008 2:00 PM
|
|
|
| City of Billings, City Clerk, PO Box 1178, Billings, MT 59103; 210 N. 27th Street, 59103
|
|
|
| City Hall Conf. Room
|
|
|
| 9/23/08, 9 am, Wtr Trtmt Plant
|
|
|
| Questions may be directed to Will Robbins, City Engineer’s Office, (406) 657-8237; or Mark Seip at HDR Engineering, Inc. at the above address and phone number, or by fax at (406) 651-6600.
|
|
|
| Yes
|
|
|
| $75
|
|
|
| The contract documents consisting of Drawings and Project Manual may be examined or obtained at the office of HDR Engineering, Inc., 2913 Millennium Circle, Billings, MT 59102, (406) 651-6693.
In addition, the Drawings and Project Manual may also be examined at City of Billings, Public Works Department, 510 N. Broadway, 4th Floor, Billings, MT 59101 or at plan exchanges in Billings, Great Falls, Bozeman, Missoula, and Montana Contractors-Helena.
|
|
|
| Mon-Fri, 8 am to 5 pm
|
|