Print
Sign up to receive a text message or email when new bids are added!

  

Print
Bid Title: Plumbing/HVAC, Electrical, and Fire Protection Subcontractors
Category: Request for Qualifications
Status: Closed

Description:

NOTICE OF REQUEST FOR QUALIFICATIONS & PROPOSALS (RFQ/RFP) for CITY OF BILLINGS CITY HALL RENOVATION PLUMBING, HEATING VENTILATING AND AIR CONDITIONING (HVAC), ELECTRICAL, AND FIRE PROTECTION SUBCONTRACTORS

Dick Anderson Construction (GC\CM) seeks to qualify and select Plumbing/HVAC, Electrical, and Fire Protection Subcontractors for the Preconstruction and Construction phases of the Billings City Hall Renovation Project. This is a Montana Prevailing Wage Rate project. The selected Subcontractors will be expected to provide:

1.    FOR THE PRECONSTRUCTION PHASE: Input to the Preconstruction team on materials & methods of construction, constructability, scheduling and cost estimating culminating in a Guaranteed Maximum Price for their portion of the Work at a time to be determined. Also provide input for Bid Packs to allow material suppliers an equal opportunity for bidding the material portions of the Work.

2.    FOR THE CONSTRUCTION PHASE: Provide all necessary materials, tools, labor and equipment for construction portions of the Project. Subcontractor must be able to provide Payment and Performance bonds for their portion of the work.

The City of Billings has selected JLG Architects as the Design Firm for the project. The project consists of:

Approximately 100,000 square foot renovation of the interior spaces of the existing Stillwater Building in downtown Billings.


Subcontractors seeking a position on the team must submit documentation in the form required by the RFQ/RFP.  The RFQ/RFP can be obtained through the Billings Builders Exchange or by contacting:


Shane Flohr        

Dick Anderson Const.     

P.O. Box 31511     

Billings, MT 59107    

    

(406) 671-7131        


AJ Harmon

Dick Anderson Construction

4512 South Frontage Rd

Billings, MT 59101

 

(406) 248-3700


The response to the RFQ/RFP is due by 09/01/2022 Mountain Daylight Time at: 4:00 PM


Dick Anderson Construction

ATTN: Shane Flohr 

Publication Date/Time:
8/12/2022 12:01 AM
Closing Date/Time:
9/1/2022 4:00 PM

Return To Main Bid Postings Page